Status Note on Pedestrian Accessibility in Vadodara

This status note gives an overview of how accessible Vadodara's streets, footpaths and transport entrances are for people who use a wheelchair, a walking stick or a pram, or who simply walk. It draws on three sources gathered by the Vadodara Access Map: a field survey of 11 barriers photographed in the city, an AI scan of 721 openly licensed street-level photos, and an analysis of what OpenStreetMap records about footpaths and kerbs.

It places these findings next to India's legal and policy framework, including the Rights of Persons with Disabilities Act, 2016, the Supreme Court's November 2024 judgment in Rajive Raturi v. Union of India, and national transport accessibility data reported in Sangyan's Status Note on Accessibility in Public Road Transport of India (May 2025).

The note is meant as a factual starting point for the Vadodara Municipal Corporation, transport operators, disability groups, residents and researchers. It is a remote audit, not a full survey of the city, and its limits are set out in section 6.

1. Key figures

11barriers photographed and recorded in the field survey, 4 of them high severity
721street-level photos scanned across Vadodara; 331 could be judged
57%of judged photos showed no footpath (189 of 331)
13 : 1zebra crossings detected versus kerb cuts detected in the same photos
8of about 26,700 OpenStreetMap road segments in Vadodara say whether a footpath exists
0OpenStreetMap kerb tags in the city box; 1 tactile_paving tag

2. Legal and policy framework

2.1 The Rights of Persons with Disabilities Act, 2016

The RPwD Act makes accessibility a legal duty rather than a favour. Section 40 asks the Central Government to set accessibility standards for the physical environment and transport. Section 41 requires steps to make transport, including bus stops and terminals, accessible. Section 44 says no building plan should be approved unless it follows those standards. Sections 45 and 46 set time limits for making existing public buildings and services accessible.

2.2 Rajive Raturi v. Union of India (8 November 2024)

The Supreme Court held that Rule 15 of the RPwD Rules, 2017 was inconsistent with the Act because it set out guidelines rather than enforceable, non-negotiable standards. It directed the Union Government to frame mandatory accessibility rules within three months, while progressive compliance with the existing rules continued in the meantime.

2.3 National guidelines

2.4 National transport context

Sangyan's Status Note on Accessibility in Public Road Transport of India (May 2025), based on information from the Ministry of Road Transport and Highways under the RTI Act, reports that as of March 2025, 35.08% of buses operated by 61 State Transport Undertakings were accessible, and 10,873 were fully wheelchair-accessible. It lists the bus-design rules behind this (GSR 159(E), GSR 959(E), AIS:153 and AIS:052) and the Accessibility Guidelines for Bus Terminals and Bus Stops (2022).

Why this matters for VadodaraAn accessible bus is only useful if a person can reach the bus stop. The footpaths, kerbs and station entrances in this note are that "first and last metre". Nationally, an AFP report in July 2026 cited a 2024 Supreme Court-appointed committee finding that 84% of footpaths it examined failed basic engineering standards.

3. Field survey findings

Om Dorkar photographed and recorded 11 barriers in Vadodara. Each record has a barrier type and a severity, which are the surveyor's judgement. In four records the photo shows the setting but not the barrier itself, and the map says so. Kerb heights and slopes were not measured.

AreaLocationBarrierSeverityWhat was found
Station areaVadodara Junction railway station, back sideStairs onlyHighEntrance reached only by a flight of steps with a handrail. No ramp visible.
SayajiganjCentral bus stationMissing rampHighFootpath at the bus station has no ramp; a kerb runs along it, with a signpost and a leaning tree at the edge.
Sayaji BaugVinoba Bhave Road, near Kala GhodaMissing rampHighRamps are disconnected from the footpath, and the footpath has no slopes.
GorwaUnnamed roadUnevenHighNo footpath or side path at all; people walk on a road with a broken edge and poles at the roadside.
Sayaji BaugSayaji Baug ZooBroken rampMedTiles broken on the ramp.
AlkapuriGJ SH 11ObstacleMedNo footpath; roadside debris blocks the flat surface a ramp would need.
Nava BazaarDandia Bazaar RoadUnevenMedNo footpath; a drain grate sits in a patched road surface.
HarniHarni Airport RoadUnevenMedRoad edge broken and eroded; water runs across the surface in the monsoon.
HarniSide road near Harni Airport RoadMissing rampMedNo ramps (noted on site; the photo shows the wet ground, not the ramp).
Not namedUnnamed pathUnevenMedNo flat surface in the monsoon; mud and standing water, with a stall taking up part of the width.
AlkapuriRoad medianUnevenLowMismatched paving with gaps and different heights.

Summary by type

Barrier typeRecords
Uneven surface5
Missing ramp3
Stairs only1
Broken ramp1
Obstacle1
Total114 high · 6 medium · 1 low

Two of the four high-severity barriers are at transport entrances: the back of Vadodara Junction railway station and the central bus station. In three records (GJ SH 11 in Alkapuri, Dandia Bazaar Road and the Gorwa road) there was no footpath at all, so pedestrians must walk on the carriageway.

4. AI street scan findings

The map runs a weekly scan of every openly licensed Mapillary street photo inside the Vadodara box (22.24–22.40 N, 73.10–73.27 E). Mapillary's own computer vision labels each photo. A simple, published rule then marks a daylight photo of a road green if a footpath is detected, red if it is a built-up street with no footpath detected, and grey if it is an open road. Of 721 photos, 390 could not be judged (night, no road, or unclear).

AreaJudged photosFootpathBuilt-up, no footpathOpen roadFootpath share
Vadodara Bypass15242902028%
Near Manjalpur11273172265%
Nava Bazaar271215044%
Wadi241311054%
Near Wadi817013%
Near Sayaji Park70610%
Ashwamegh Nagar1100n too small
All areas3311421464343%

5. Gaps in open map data

Navigation apps and planners often rely on OpenStreetMap. For Vadodara it records almost nothing about accessibility:

A person planning a route in a wheelchair therefore cannot learn from open data whether a street has a usable footpath or a kerb ramp. Filling this gap is one of the cheapest improvements available.

6. Limits of this note

7. Recommendations

  1. Fix the transport entrances first. The railway authorities should add a ramp at the back entrance of Vadodara Junction, and the bus station operator should add a kerb ramp on the station footpath. These are the places where an accessible bus or train is lost if the entrance is not.
  2. Check the 13 detected zebra crossings for kerb ramps and add ramps where they are missing, following IRC:103-2022 and the 2021 Harmonised Guidelines.
  3. Reconnect the Sayaji Baug ramps on Vinoba Bhave Road to the footpath, and repair the broken ramp tiles at the zoo.
  4. Build continuous footpaths on roads where people now walk on the carriageway, starting with GJ SH 11 in Alkapuri, Dandia Bazaar Road and the Gorwa road in this survey.
  5. Publish accessibility data. The Vadodara Municipal Corporation could publish which streets, crossings and public buildings have been audited under the RPwD Act. A Right to Information request is the natural next step if this is not public.
  6. Map what exists. Residents and mappers can add sidewalk, kerb and tactile_paving tags to OpenStreetMap so that route-planning tools can use them.
  7. Involve disabled people in every audit, including the next round of this one.

Next steps for this project

8. References and data

  1. Vadodara Access Map: live map, code and data, including method and limits, data sources and checked facts and detector metrics.
  2. Sangyan, Status Note on Accessibility in Public Road Transport of India (May 2025): Medium. Related: Factsheet: Accessible India Campaign (May 2024) and Status Note for Accessibility in Public Transport of India (March 2025).
  3. Supreme Court of India, Rajive Raturi v. Union of India, judgment of 8 November 2024: judgment (PDF); summary in SCC Online.
  4. The Rights of Persons with Disabilities Act, 2016, Sections 40, 41, 44, 45 and 46.
  5. Ministry of Housing and Urban Affairs, Harmonised Guidelines and Standards for Universal Accessibility in India (2021).
  6. Indian Roads Congress, IRC:103-2022 Guidelines for Pedestrian Facilities.
  7. AFP, "India's choked pavements fail pedestrians" (July 2026), via Cambodianess.
  8. Street imagery: Mapillary contributors, CC-BY-SA 4.0. Map data: © OpenStreetMap contributors, ODbL.